Friday 9 February 2024

FUTURE PLANS (Pt 5)

Along with all the exciting decorative and building work, we will be doing a lot of necessary maintenance to the structure of the building. The roof, stone and brickwork all need attention. A lot of electrical wiring is due to be replaced. There will be a new more efficient underfloor heating system and better lighting.

All of this work is essential if we are to leave to future generations a church that is fit for purpose, and ready to serve the needs of a growing Catholic community in the city of Oxford.

Help us complete Phase 1: www.oxfordoratory.org.uk/murals

#oxfordoratory #oratory150

View on Instagram