Friday 5 April 2013

New Building: Weeks 53-55

After some difficult drilling and digging, the new water supply and drains are in place. The electricity should be connected soon.

The underfloor heating is fitted in the library, and work on the floor continues:

The bedrooms and bathrooms are nearly finished:

And we have a glimpse of the new parish kitchen: